Facility Improvement Measures
|
Start
Date
|
Estimated Cost
|
|
Multipurpose
Room Addition
|
October 2010
|
$1,371,900
|
|
Geo Project
Elevated (Ventilation and Cooling)
|
Summer 2010
|
$1,738,878
|
|
Geo Project
NON - Elevated
|
|
|
|
Drop Ceiling
|
Summer 2010
|
$358,300
|
|
Catwalk to
H&V Units
|
Summer 2010
|
$71,200
|
|
Door Retrofit
|
Summer 2011
|
$68,700
|
|
Fire
Sprinkler System
|
Summer 2010
|
$217,100
|
|
Security
Upgrades
|
|
|
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
Lighting and
Occ Sensors
|
Summer 2010
|
$94,000
|
|
PC shutdown
software
|
Summer 2011
|
$4,400
|
|
Plug Load
Control
|
Summer 2011
|
$9,300
|
|
Freezer Temp
Control
|
Summer 2011
|
$200
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
Solar Array
|
|
|
|
Water Fixture
Retrofit
|
Summer 2011
|
$81,400
|
|
Solar Snow
Melt
|
Summer 2011
|
$43,100
|
|
Irrigation
Improvements
|
Summer 2011 |
$9,400
|
|
LEED-EB
Documentation
|
Summer 2011
|
$14,400
|
Back to top

|
Facility Improvement Measures
|
Start
Date
|
Estimated Cost
|
|
Geo Project
Elevated (Ventilation and Cooling)
|
Summer 2010
|
$1,633,641
|
|
Geo Project
NON - Elevated
|
|
|
|
Covered
Walkway between buildings
|
Undetermined
|
$95,300
|
|
Door Retrofit
|
November
2010
|
$68,700
|
|
Install Drop
Ceiling
|
November 2010
|
$280,900
|
|
Repair
Ductwork Insulation
|
November 2010
|
$3,600
|
|
Fire
Sprinkler System
|
November 2010
|
$193,900
|
|
Security
Upgrades
|
|
|
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
Lighting and
Occ Sensors
|
November 2010
|
$100,200
|
|
Waste
Management System
|
November 2010
|
$69,100
|
|
PC Shutdown
Software
|
November 2010
|
$3,100
|
|
Plug Load
Control
|
November 2010
|
$5,300
|
|
Vending Miser
|
November 2010
|
$800
|
|
Window
Retrofit
|
November 2010
|
$16,200
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
Irrigation
Improvements
|
Undetermined
|
$72,300
|
|
Water Fixture
Retrofit
|
November 2010
|
$65,300
|
|
Solar Array
|
|
|
|
LEED-EB
Documentation
|
November 2010
|
$14,300
|
|
Facility Improvement Measures
|
Start
Date
|
Estimated Cost
|
|
Geo Project
Elevated (Ventilation and Cooling)
|
November 2010
|
$2,314,703
|
|
Geo Project
NON - Elevated
|
|
|
|
Catwalk to
access Heating & Ventilation
|
November 2010
|
$71,200
|
|
Ground Source
Heat Pump (Included in Geo project
|
November
2010
|
|
|
HS Cooling
Aid
|
November 2010
|
$17,800
|
|
Door Retrofit
|
November 2010
|
$20,600
|
|
Install Hot
Water Circ Loop
|
November 2010
|
$10,300
|
|
Security
Upgrades
|
|
|
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
Lighting and
Occ Sensors
|
November 2010
|
$59,500
|
|
Retro-Commissioning
|
November 2010
|
$45,400
|
|
PC Shutdown
Software
|
November 2010
|
$3,300
|
|
Plug Load
Control
|
November 2010
|
$5,300
|
|
Vending Miser
|
November 2010
|
$2,800
|
|
Domestic Hot
Water set point adjustment
|
November 2010
|
$400
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
Water Fixture
Retrofit
|
November 2010
|
$29,500
|
|
Solar Array
|
|
|
|
LEED-EB
Documentation
|
November 2010
|
$28,400
|
Back to top
|
Facility Improvement Measures
|
Start
Date
|
Estimated Cost
|
|
Geo Project
|
January 2011
|
$1,725,294
|
|
Auditorium
Improvements
|
Summer 2011
|
$882,500 |
|
Door Retrofit
|
January 2011
|
$34,400
|
|
Install Drop
Ceiling
|
January 2011
|
$615,900
|
|
Fire
Sprinkler System
|
January 2011
|
$424,700
|
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
Lighting and
Occ Sensors
|
Summer 2011
|
$380,600
|
|
PC Shutdown
Software
|
|
$800
|
|
Plug Load
Control
|
|
$6,600
|
|
Install VFD
on Heat Pump loop pumps
|
Summer 2011
|
$47,000
|
|
Retro-commissioning
|
Summer 2011
|
$56,300
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
Water Fixture
Retrofit
|
January 2011
|
$54,500
|
|
Solar Array
|
|
|
|
LEED-EB
Documentation
|
January 2011
|
$16,000
|
Back to top
|
Facility Improvement Measures
|
Start
Date
|
Estimated Cost
|
|
HVAC Controls
Retrofit
|
Undetermined
|
$31,300
|
|
Fire
Sprinkler System
|
Undetermined
|
$43,800
|
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
PC Shutdown
Software
|
Undetermined
|
$1,000
|
|
Plug Load
Control
|
Undetermined
|
$4,500
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
LEED-EB
Documentation
|
Undetermined
|
$14,300
|
Back to top
|
Facility Improvement Measures
|
Start
Date
|
Estimated Cost
|
|
Geo Project
Elevated (Cooling)
|
Summer 2011
|
$3,495,650
|
|
Carpet/Flooring Replacement
|
Summer 2011
|
$279,000
|
|
Kitchen
Remodel
|
Summer 2011
|
$289,400
|
|
Install Drop
Ceiling
|
Summer 2011
|
$618,000
|
|
Door Retrofit
|
Summer 2011 |
$68,700
|
|
Transformer
Move
|
Summer 2011
|
$109,900
|
|
Fire
Sprinkler System
|
Summer 2011
|
$450,500
|
|
Security
Upgrades
|
|
|
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
Lighting and
Occ Sensors
|
Summer 2011
|
$188,100
|
|
PC Shutdown
Software
|
Summer 2011
|
$6,300
|
|
Plug Load
Control
|
Summer 2011
|
$11,100
|
|
Vending Miser
|
Summer 2011
|
$1,400
|
|
Window
Retrofit
|
Summer 2011
|
$23,700
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
Irrigation
Improvement
|
Undetermined
|
$71,600
|
|
Solar Array
|
|
|
|
Water Fixture
Retrofit
|
Summer 2011
|
$69,400
|
|
Solar Snow
Melt
|
Undetermined
|
$43,100
|
|
LEED-EB
Documentation
|
Summer 2011
|
$15,400
|
Back to top
|
Facility Improvement Measures
|
Start
Date
|
Estimated Cost
|
|
Geo Project
Elevated (Ventilation and Cooling)
|
Summer 2012
|
$1,875,500
|
|
Geo Project NON - Elevated
|
|
|
|
Carpet
Replacement
|
Summer 2012
|
$305,600
|
|
Solution to
East Side of Building (ice)
|
Summer 2012
|
$143,200
|
|
Door Retrofit
|
Summer 2012
|
$96,200
|
|
Security
Upgrades
|
|
|
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
Lighting and
Occ Sensors
|
Summer 2012
|
$138,300
|
|
PC Shutdown
Software
|
Summer 2012
|
$7,800
|
|
Plug Load
Control
|
Summer 2012
|
$8,500
|
|
Vending Miser
|
Summer 2012
|
$800
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
Day Lighting
|
Summer 2012
|
$199,600
|
|
Water Fixture
Retrofit
|
Summer 2012
|
$40,400
|
|
Solar Array
|
|
|
|
LEED-EB
Documentation
|
Summer 2012
|
$14,500
|
Back to top
|
Facility Improvement Measures
|
Start
Date
|
Estimated Cost
|
|
HVAC Retrofit
|
|
|
|
HVAC Controls Retrofit
|
|
|
|
Fire
Sprinkler System
|
|
|
|
Security
Upgrades
|
|
|
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
Lighting and
Occ Sensors
|
|
|
|
PC Shutdown
Software
|
|
|
|
Plug Load
Control
|
|
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
LEED-EB
Documentation
|
|
|
Back to top
|
Facility Improvement Measures
|
Start
Date
|
Estimated Cost
|
|
Geo Project
|
January 2011
|
$501,224
|
|
HVAC Retrofit
|
January 2011
|
$20,600
|
|
Ground Source
Heat Pump (Included in Geo Project)
|
|
|
|
Security
Upgrades
|
|
|
|
Data Center
|
|
|
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
Lighting and
Occ Sensors
|
January 2011
|
$59,300
|
|
PC Shutdown
Software
|
January 2011
|
$1,500
|
|
Plug Load
Control
|
January 2011
|
$13,200
|
|
Waste Oil
Furnace
|
January 2011
|
$10,800
|
|
Retro-Commissioning
|
January 2011
|
$37,700
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
Water Fixture
Retrofit
|
January 2011
|
$16,300
|
|
Solar Array
|
|
|
|
LEED-EB
Documentation
|
January 2011
|
$14,300
|
Back to top
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
Geo Project
|
January 2011
|
$1,250,000
|
|
Lighting and
Occ Sensors
|
January 2011
|
$104,400
|
|
PC Shutdown
Software
|
January 2011
|
$15,600
|
|
Plug Load
Control
|
January 2011
|
$19,200
|
|
Install VFD
on HP loop pumps
|
January 2011
|
$113,400
|
|
Retro-Commissioning
|
January 2011
|
$120,500
|
|
Ground Source
Heat Pump (include in Geo Project)
|
|
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
Irrigation
Improvements
|
|
$82,900
|
|
Solar Array
|
|
|
|
Solar Snow
Melt
|
Undetermined
|
$43,100
|
|
Heat Recovery
for Domestic Water
|
January 2011
|
$49,900
|
|
LEED-EB
Documentation
|
January 2011
|
$18,100
|
Back to top
|
Facility Improvement Measures
|
Start
Date
|
Estimated Cost
|
|
Geo Project
|
|
$2,893,376
|
|
Security
Upgrades
|
|
|
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
Lighting and
Occ Sensors
|
Undetermined
|
$59,100
|
|
PC Shutdown
Software
|
Undetermined
|
$12,900
|
|
Plug Load
Control
|
Undetermined
|
$16,100
|
|
Install VFD
on HP loop pumps
|
Undetermined
|
$76,300
|
|
Retro-Commission
|
Undetermined
|
$81,000
|
|
Waste
Management System
|
Undetermined
|
$69,100
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
Solar Array -
Pilot
|
Undetermined
|
$234,600
|
|
LEED-EB
Documentation
|
Undetermined
|
$17,300
|
Back to top
|
Energy Conservation Measures
|
Start Date
|
Estimated Cost
|
|
Geo
Project-Woodside
|
|
$1,096,908
|
|
Lighting and
Occ Sensors
|
Undetermined
|
$53,300
|
|
PC Shutdown
Software
|
Undetermined
|
$4,500
|
|
Plug Load
Control
|
Undetermined
|
$11,900
|
|
Install VFD
on HP loop pumps
|
Undetermined
|
$74,300
|
|
Retro-Commission
|
Undetermined
|
$66,400
|
|
Sustainability Measures
|
Start Date
|
Estimated Cost
|
|
Irrigation
Improvements
|
|
$30,700
|
|
Solar Array
|
|
|
|
LEED-EB
Documentation
|
|
$14,500
|
Back to top
|
Facility Improvement Measures
|
Start Date
|
Estimated Cost
|
|
Geo Wells for
Campus
|
November 2011
|
$2,500,849
|
|
Waste
Management System
|
January 2011
|
$69,100
|
Back to top |